Fugro to probe US offshore wind development option

Fugro has been awarded the contract by Vineyard Wind, formerly named OffshoreMW, to perform a marine geotechnical site investigation within its wind development lease, offshore Massachusetts.

Fugro’s state-of-the-art, 105m drilling vessel M/V Fugro Synergy will perform the study, which will include numerous seabed CPTs and exploration boreholes, along with sampling and downhole CPTs. Following the fieldwork, a program of laboratory testing and reporting will be performed by Fugro’s offices in Houston, Texas and Norfolk, Virginia.

The site investigation will be used to verify geologic ground models that Vineyard Wind is developing based on previous geophysical data collected from the 166,866-acre lease area. The investigation is planned to start before the end of October and take around two to three weeks.

In August, construction was completed at the US's first offshore wind farm, Block Island.

Image of the Fugro Synergy, from Fugro.

Read more:

Block Island Wind Farm completes construction

Building blocks

 

Offshore wind rebounds

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine