VNG Norge submits Fenja PDO

VNG Norge today (19 December) submitted the US$1.2 billion (NOK 10.2 billion) plan for development and operation (PDO) for the Fenja field in the Norwegian Sea. The company previously estimated its development plan for Fenja to cost $1.3 billion (NOK11.5 billion).

Fenja field. Source: VNG Norge

Formerly known as Pil and Bue (bow and arrow), Fenja will be developed via two subsea templates with three producer wells, two water injectior wells, and one gas injector well, connected to the Njord A platform for processing, storage and export via the Njord B ship. Production is scheduled to begin in 2021 and last 16 years.

Located at Haltenterassen in Block 6406/12, Fenja contains recoverable resources of approximately 100MMboe, including 11MMscm of oil, 3.4Bscm of gas, and .57MM tonnes of natural gas liquids. These figures include the Pil reservoir; the Bue reservoir represents a possible upside in the Fenja development plan, VNG Norge said in 19 December statement.

Fenja will mark VNG Norge’s first development operatorship. Partners in the Fenja field in PL586 include VNG Norge (30%), Point Resources (45%), and Faroe Petroleum Norge (25%).

Read more:

VNG Norge submits Fenja assessment

TechnipFMC wins Fenja EPCI, SURF work

West Phoenix to drill at Fenja field

Current News

Asso.subsea Wraps Up Subsea Cables Installation at French Floating Wind Pilot

Asso.subsea Wraps Up Subsea Ca

Dayrates Rise - Will More Energy Companies Buy Offshore Rigs?

Dayrates Rise - Will More Ener

MOL and Gaz-System Sing Long-Term FSRU Charter for New Polish LNG Terminal

MOL and Gaz-System Sing Long-T

Ørsted Inaugurates Largest Offshore Wind Farms in Asia-Pacific

Ørsted Inaugurates Largest Off

Subscribe for OE Digital E‑News

Offshore Engineer Magazine