Mubadala starts Manora field drilling

Published

Mubadala Petroleum has started a three-well drilling program at the Manora oil field in the northern Gulf of Thailand, says partner Tap Oil. 

The program in the G1/48 concession, using the Atwood Orca jackup drilling unit, comprises two development wells and an exploration well.

The MNA-18 and MNA-19 infill wells have been planned to develop proved undeveloped reserves and will be drilled to final total depths of 3107m and 2366m (measured depth) respectively. They will be completed with electric submersible pumps (ESPs), with drilling and completion planned to take approximately 21 days for each well on a trouble free basis. 

The two development wells are expected to increase Manora production performance.

The Joint Venture is also intending to drill an exploration well to test the L-Prospect in the Manora production licence area after the conclusion of the two development wells.

Tap will provide an update upon completion of the drilling of the two development wells. 

Current News

Trump Calls Out California, UK Energy Deal

Trump Calls Out California, UK

DOF Group ASA Awarded Contract in Argentina

DOF Group ASA Awarded Contract

Jifmar, Seavium Partner to Roll Out AI Across Offshore Fleet

Jifmar, Seavium Partner to Rol

DUG Hooks Multi-Client Seismic Reprocessing Survey off Malaysia

DUG Hooks Multi-Client Seismic

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine