Weizhou 12-2 phase two online

CNOOC's Weizhou 12-2 phase II project started production, the company announced today (28 November).

The Weizhou 12-2 phase II project is in Beibu Gulf in the South China Sea with an average water depth of approximately 35.7m. The project uses existing Weizhou 12-2 oil field facilities and includes one wellhead platform. There are seven wells currently producing approximately 6400 bo/d. The project is expected to reach its designed peak production of approximately 11,800 bo/d in 2018, according to CNOOC.

CNOOC operates the Weizhou 12-2 oil field phase II project with 100% interest.
 

Current News

Fugro Gets Dogger Bank South Offshore Wind Survey Job

Fugro Gets Dogger Bank South O

Vallourec Wins ExxonMobil’s Whiptail Order Offshore Guyana

Vallourec Wins ExxonMobil’s Wh

Petrobras Signs Contracts with Perenco for Sale of Two Campos Basin Fields

Petrobras Signs Contracts with

Equinor Upbeat About Investor Interest in US Offshore Wind Farm

Equinor Upbeat About Investor

Subscribe for OE Digital E‑News

Offshore Engineer Magazine