Lukoil's Phase 2 Filanovsky topsides set sail

Published

Russian's Lukoil says its Phase 2 Vladimir Filanovsky LSP-2 ice-resistant topsides have set sail for the Caspian Sea. Production from the project is due at the end of this year.  

Phase 2 of Vladimir Filanovsky field development provides for the construction of a fixed ice-resistant platform, an accommodation-topside platform and a crossover between the platforms, all being built at Astrakhan’s shipyards. 

A tugboat caravan will tow the topside, weighing more than 7000-tonne, to the Caspian Sea. The substructures for the facility were installed in the summer of 2016. 

The Vladimir Filanovsky field Phase 1 came on stream in 2016. Lukoil says it has 129 million tonnes of oil and 30 Bcm of gas recoverable reserves. The designed annual production rate is 6 million tonnes of oil.

All the offshore facilities at Lukoil's Caspian fields were manufactured at shipyards in Russia.

Image from Lukoil. 

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine