SPT Offshore gets LOI for Ophir wellhead platform

Published

SPT Offshore has received the letter of intent (LOI) for the detailed design of the suction pile foundation, design supervision of the jacket and full transportation and installation of the Ophir wellhead platform from Muhibbah Engineering.

The jacket with integrated suction pile foundation will be installed in one piece offshore.

Muhibbah is the EPCIC contractor for this project, which is based on SPT Offshore’s solution consisting of a tri-legged jacket with an integrated suction pile foundation.

Ophir Production is a joint venture company between Octanex (50%), Scomi D&P (30%) and Vestigo Petroleum (20%).

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine