Offshore Construction News - page 49

 

Hess cuts budget but stays with deepwater

Jan 27, 2015

New York-headquartered Hess says it is cutting its 2015 capital and exploration budget by 16%, compared to 2014, to US$4.7 billion. While the firm said most of the cash (45%/$2.1 billion) would be spent on its unconventional shale resources…

Technip lands Amethyst contracts

Jan 27, 2015

Technip won two contracts for flexible pipe supply and installation at the Amethyst field, in Mississippi Canyon 26, in the US Gulf of Mexico.  The Deep Blue. From Technip.   Both contracts are for operator Stone Energy…

Gazprom targets Baltic LNG

Jan 22, 2015

Russia’s Gazprom announced plans to build a new LNG plant on the Baltic Sea on Thursday (22 January).  The project, called Baltic LNG, will be built at Ust-Luga, in the Leningrad region, near the Gulf of Finland. It will be capable of producing 10 MPTA of LNG…

Hejre topside time-lapse

Jan 20, 2015

DONG Energy provides this time-lapse video of the Herje topsides construction process, which took place from April to October 2014. Hejre is Dong Energy’s first high-pressure, high-temperature (HPHT) development and is expected to begin production in 2017 with an estimated 170 MMboe…

Total fires up HPHT West Franklin project

Jan 15, 2015

Total has started gas and condensate production from the high-pressure, high-temperature (HPHT) West Franklin Phase 2 project in the Central Graben area of the UK North Sea. The project, tapping 85 MMboe, will supply 40,000 boe/d to the…

LMC in US$110 Jurong Brazil contract

Jan 14, 2015

Singapore’s Jurong Shipyard awarded Ezra Holding subsidiary London Marine Consultants (LMC), a contract to supply an external turret mooring system for the Libra field’s extended well test (EWT) FPSO vessel. The Libra oil field is a large…

AVEVA opens Saudi Arabia office

Jan 14, 2015

AVEVA opened a new office in Saudi Arabia to strengthen its presence in the Middle East and further enhance its growing global network. The office will offer sales and support for all of AVEVA’s solutions and services, with particular focus on owner operators (OOs) and engineering…

Schnitger chief calls for early engineering analysis

Jan 13, 2015

Schnitger President Monica Schnitger urged oil and gas companies to explore and exploit the latest technologies to have successful projects at the 2014 Bentley Systems Year in Infrastructure conference. Meg Chesshyre has more.   “I’m…

Van Oord receives Damen vessel

Jan 09, 2015

Van Oord took delivery of Damen’s offshore carrier (DOC) 8500 cable laying vessel, the Nexus. The Nexus. From Damen.   The Nexus is a 126-m vessel that will be used for the installation…

Det norske picks Alphstrut for Ivar Aasen

Jan 09, 2015

Offshore aluminium support system provider Alphastrut has been awarded a six figure contract with Det norske to provide raised access flooring on the Ivar Aasen Northern North Sea development. The Alphastrut system will cover a total…

EMAS lines up work for flagship

Jan 09, 2015

EMAS AMC's subsea division EMAS has secured a subsea construction contract for its newbuild flagship vessel with Apache Energy in Australia valued worth more than AUZ$130 million (approximately US$105 million). The work scope includes project management…

Keppel Singmarine secures US$48.7 million contracts

Jan 06, 2015

Keppel Singmarine Pte Ltd. secured two contracts worth a total of approximately US$48.7 million. The first contract was awarded by Dubai-based Seaways International Pte Ltd. to build a multi-task anchor handling tug (AHT) vessel suitable for an array of offshore activities…

McDermott Altamira first free trade zone in Mexico

Jan 06, 2015

McDermott International received authorization from the Central Administration of Customs in Mexico to operate its Altamira fabrication facility near Tampico, Mexico, as a free trade zone. The Altamira fabrication yard…

Valemon comes on stream

Jan 04, 2015

The Statoil-operated, NOK 22.6 billion Valemon high-pressure, high-temperature, gas and condensate development in the Norwegian sector of the North Sea started first production yesterday (3 January).  The Valemon field, containing an estimated 192 MMboe recoverable reserves…

Unlocking marginal fields

Jan 01, 2015

The pressure is on to find economically viable ways to develop marginal fields, in the UK North Sea and further afield. Ben Smith and Ed Randall look at the challenges and options. More and more emphasis is being placed by operators and…

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine