RED's monitoring tool used on Beatrice

A monitoring technology developed by RED Engineering has been used for the first time to improve accuracy, speed and safety during the installation of jacket foundations for wind turbines at the Beatrice Offshore Wind Farm Ltd project in the Moray Firth, Scotland.

The development by the north east-England based firm features remote proximity sensors to confirm the correct engagement of an internal lifting tool (ILT) in use by Seaway Heavy Lifting, a Subsea 7 company.

These are connected to a remote monitoring system providing improved control of the lifting tool and confirming correct engagement. In addition to improved accuracy during lifting, the RED Engineering system delivers offshore time saving advantages for SHL, allowing riggerless operations to be undertaken.

Tim Newsome, mechanical engineer at of RED Engineering, explained that prior to using the new technology, SHL would deploy a man-basket suspended from a second crane to check the engagement of the internal lifting clamp – a procedure with inherent risk precluded by wet or windy weather conditions. 

He added: “This latest project is typical of the value added by our innovative application of existing technology, reducing risks and saving our client’s time and money. 

“We’re delighted that SHL has placed its faith in our expertise and experienced engineers, and look forward to further applications of this beneficial technology in offshore operations.”

Seaway Heavy Lifting is a leading offshore contractor to operators in the global oil and gas and renewables industry offering tailored T&I and EPCI solutions. 

Edgar Steinebach, innovation specialist, said the first operation with the RED system has been a major success, and added: “This is a step forward for this type of lifting operation and allows us to offer a better service to our clients in the offshore wind sector.”

The tool features sensors as part of a remote monitoring unit mounted onto the ILT. Signals received at a base station located adjacent to the ILT operator indicate that the sensors are in or out of position. In the future, the tool could be adapted and upgraded to report if there are any obstructions between the remote and base units.

The system works in combination with CCTV for improved monitoring and visibility, increasing all round safety and ensuring that operations remain less weather dependent. 

 

Current News

New CSOV Delivered to Rem Offshore

New CSOV Delivered to Rem Offs

All Clear for Construction Start of Virginia’s 2.6GW Offshore Wind Farm

All Clear for Construction Sta

DEME’s Orion Vessel Heads to US After Finishing Scottish Offshore Wind Job

DEME’s Orion Vessel Heads to U

EnQuest Selling Stake in North Sea Golden Eagle Oil Field

EnQuest Selling Stake in North

Subscribe for OE Digital E‑News

Offshore Engineer Magazine