From 30 January to 3 February 2017, the Petroleum Safety Authority Norway (PSA) carried out an audit of the planning and execution of work on hydrocarbon-carrying systems for Eni's Goliat facility.

The audit was a sub-activity of an audit series that will continue throughout 2017. The background to this sub-audit includes the seven hydrocarbon leaks that occurred in 2016.

The objective of the audit was to follow up on how Eni is managing risk associated with work on hydrocarbon-carrying systems, and how the compensatory measures implemented for this area are working.

The audit detected one non-conformity associated with knowledge of the status of safety systems.

In addition, improvement points were detected in connection with:

  • Management of competence for personnel with responsibilities and duties linked to hydrocarbon-carrying systems.
  • Dissemination of information
  • Procedures
  • Key locks on valves liable to be incorrectly operated.

Eni has been given a deadline of 12 May 2017 to report on how the non-conformity will be dealt with and how the improvement points will be assessed.

Current News

Ørsted Picks Rovco for Offshore Wind O&M Work in US

Ørsted Picks Rovco for Offshor

Noble Corporation’s Drillship Seizes Africa’s Drilling Opportunities

Noble Corporation’s Drillship

Trident Energy to Restart Drilling Campaign Off Equatorial Guinea with Noble Venturer Drillship

Trident Energy to Restart Dril

Navigation and Wind Farms: Competing Ocean Uses Raise Existential Questions

Navigation and Wind Farms: Com

Subscribe for OE Digital E‑News

Offshore Engineer Magazine