CNOOC starts at Weizhou

Published

CNOOC Ltd. started production at the Weizhou 6-9/6-10 comprehensive adjustment project in the South China Sea.

The Weizhou field is in the Beibu Gulf at about 35m water depth.

In addition to fully utilizing the existing facilities of Weizhou 6-9/6-10, this adjustment project has also built one wellhead platform. There is currently one producing well producing approximately 850 bo/d.

The adjustment project is expected to reach its ODP designed peak production of approximately 3800 bo/d in 2018.

CNOOC is the operator and holds 100% in Weizhou 6-9/6-10.

Image from CNOOC.

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine