OMV to drill Hades & Iris

OMV Norge is expected to start drilling on the Hades & Iris prospect in production licence 644 in the Norwegian Sea early next month (December) following approval from the Norwegian Petroleum Directorate for well 6506/11-10. 

Drilling, in 342n water depth, is expected to take about 142 days, using the Deepsea Bergen semisubmersible drilling rig, an Aker H-3.2 type, built at Aker Verdal in 1983, owned and operated by Odfjell Drilling. 

Current News

Argeo Lands Woodside Energy’s Calypso Survey

Argeo Lands Woodside Energy’s

Equinor's Hammerfest LNG Plant Evacuated Due to Gas Leak

Equinor's Hammerfest LNG Plant

Mocean Energy’s Blue X Wave Device and Verlume’s Halo Battery Come Ashore

Mocean Energy’s Blue X Wave De

Fugro’s Self-Elevating Platform On Call for Japan’s Offshore Wind

Fugro’s Self-Elevating Platfor

Subscribe for OE Digital E‑News

Offshore Engineer Magazine