Statoil makes 8th hit off Tanzania

Statoil hit big at its eighth discovery offshore Tanzania at the Mdalasini-1 exploration well, with an additional 1-1.8 Tcf of natural gas.

Map of Block 2. From Statoil.
 

Mdalasini-1 is located at 2296m water depth at the southernmost edge of Block 2.

The discovery of an additional 1.0-1.8 Tcf of natural gas in Tertiary and Cretaceous sandstones in place at Mdalasini-1, brings the total of in-place volumes up to approximately 22 Tcf in Block 2 for the Norwegian giant and its partners.

The well marks the completion of the first phase of the Tanzanian multi-well program.

“Since the start of the program in February 2012, we have drilled 13 wells and made eight discoveries, including Mdalasini-1,” says Nick Maden, Statoil senior VP exploration activities in the Western Hemisphere.  “We still see prospectivity in the area, but after appraising the Tangawizi-1 high-impact discovery, which was made in March 2013, there will be a pause in the drilling to evaluate the next steps and to mature new prospects.”

Statoil drilled the Mdalasini-1 well with a 100% working interest.

Statoil and joint venture partner ExxonMobil made seven discoveries in Block 2, including the five high-impact gas discoveries Zafarani-1, Lavani-1, Tangawizi-1, Mronge-1 and Piri-1, as well as the discoveries in Lavani-2 and Gilligiliani-1.

The seventh and latest discovery before Mdalasini-1 was the Giligiliani-1 that contains about 1.2 Tcf of natural gas in place in Upper Cretaceous sandstones. Giligiliani-1 is located along the western side of Block 2 at 2500m water depth.

The Mronge-1 discovery made in December 2013, was touted as the year’s top gas discovery in OE’s biggest oil and gas discoveries list. The JV’s fifth discovery in Block 2 contained 2-3 Tcf of natural gas by Statoil’s estimations. Gas was discovered at two separate levels.

The Zafarani-1 discovery, made in 2012, was a play opener for the Block.

Statoil operates the license on Block 2 on behalf of Tanzania Petroleum Development Corp. (TPDC) and has a 65% working interest. ExxonMobil E&P Tanzania holds the remaining 35%. TPDC has the right to a 10% working interest in case of a development phase.

Read more:

Seventh Tanzanian gas find for Statoil

The biggest oil and gas discoveries

Current News

Argeo Lands Woodside Energy’s Calypso Survey

Argeo Lands Woodside Energy’s

Equinor's Hammerfest LNG Plant Evacuated Due to Gas Leak

Equinor's Hammerfest LNG Plant

Mocean Energy’s Blue X Wave Device and Verlume’s Halo Battery Come Ashore

Mocean Energy’s Blue X Wave De

Fugro’s Self-Elevating Platform On Call for Japan’s Offshore Wind

Fugro’s Self-Elevating Platfor

Subscribe for OE Digital E‑News

Offshore Engineer Magazine