West Phoenix to drill at Fenja field

VNG Norge, part of German group VNG, has lined up a drilling for for work on the Fenja development in the Norwegian Sea. 

VNG Norge has issued a letter of intent (LOI) to North Atlantic Norway for the semisubmersible drilling rig West Phoenix for drilling of development wells on Fenja (previously known as Pil and Bue, or bow and arrow).

The LOI covers six development wells (three producers, two water injectors and one gas injector) on Fenja, with drilling starting in 2020. In addition, the LOI covers three optional wells before and three optional wells after the fixed period.

The final contract will be signed pending a final investment decision planned for later this month, and subject to the authorities’ approval of the plan for development and operations.

In June, VNG Norge submitted its US$1.3 billion (NOK11.5 billion) assessment to develop Fenja. Pil is estimated to hold 7.5-14.9 MMcum of recoverable oil and condensate, and 3.7-5.9 Bcm of recoverable gas. Bue is estimated to contain 1.5-2.6 MMcum of recoverable oil equivalent.

VNG Norge is operator of Fenja with 40% interest. Its partners in PL 586 include Point Resources (45%) and Faroe Petroleum Norge (25%).

Read more:

VNG Norge submits Fenja assessment

TechnipFMC wins Fenja EPCI, SURF work

Current News

Equinor's Hammerfest LNG Plant Evacuated Due to Gas Leak

Equinor's Hammerfest LNG Plant

Mocean Energy’s Blue X Wave Device and Verlume’s Halo Battery Come Ashore

Mocean Energy’s Blue X Wave De

Fugro’s Self-Elevating Platform On Call for Japan’s Offshore Wind

Fugro’s Self-Elevating Platfor

Galp Seeks to Sell Stake in Namibia Oilfield After Discovery

Galp Seeks to Sell Stake in Na

Subscribe for OE Digital E‑News

Offshore Engineer Magazine