PSA audits Goliat facility

From 30 January to 3 February 2017, the Petroleum Safety Authority Norway (PSA) carried out an audit of the planning and execution of work on hydrocarbon-carrying systems for Eni's Goliat facility.

The audit was a sub-activity of an audit series that will continue throughout 2017. The background to this sub-audit includes the seven hydrocarbon leaks that occurred in 2016.

The objective of the audit was to follow up on how Eni is managing risk associated with work on hydrocarbon-carrying systems, and how the compensatory measures implemented for this area are working.

The audit detected one non-conformity associated with knowledge of the status of safety systems.

In addition, improvement points were detected in connection with:

  • Management of competence for personnel with responsibilities and duties linked to hydrocarbon-carrying systems.
  • Dissemination of information
  • Procedures
  • Key locks on valves liable to be incorrectly operated.

Eni has been given a deadline of 12 May 2017 to report on how the non-conformity will be dealt with and how the improvement points will be assessed.

Current News

KOIL Energy Lands Multi-Million-Dollar Subsea Deal

KOIL Energy Lands Multi-Millio

PBS Extends Maintenance Contract with TotalEnergies for North Sea Assets

PBS Extends Maintenance Contra

Trident Energy Enters Congo’s Oil and Gas Sector with Chevron and TotalEnergies Deals

Trident Energy Enters Congo’s

Sintana Energy Expands Orange Basin Scope Offshore Namibia

Sintana Energy Expands Orange

Subscribe for OE Digital E‑News

Offshore Engineer Magazine