CNOOC commences Luda 10-1 production

Published

CNOOC Limited has announced that the Luda 10-1 comprehensive adjustment project has commenced production.

The Luda 10-1 oilfield is located in Liaodong Bay of Bohai with an average water depth of approximately 30m. In addition to fully utilizing the existing facilities of Luda 10-1, this adjustment project has also built one wellhead platform. There are currently 13 producing wells producing approximately 3300bopd. The adjustment project is expected to reach its ODP designed peak production of approximately 6000bopd in 2016.

The Luda 10-1 is an independent oilfield in which CNOOC Limited holds 100% interest and acts as the operator.

Image:Logo/CNOOC Limited

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine