TechnipFMC wins Liza contract

Published

ExxonMobil has awarded TechnipFMC a contract for the engineering, manufacture and delivery of the subsea equipment for the Liza deepwater project. The award scope includes 17 total enhanced vertical deepwater trees and associated tooling, as well as five manifolds and associated controls and tie-in equipment.

“We are committed to execution excellence and the successful long-term development of the project in Guyana,” said Hallvard Hasselknipe, president Subsea Projects, TechnipFMC.

Liza, operated by ExxonMobil subsidiary Esso Exploration and Production Guyana, is in the Stabroek block approximately 193km (120mi) offshore Guyana in waters depths of 1500m (4900ft) to 1900m (6200ft). This greenfield development has an estimated recovery in excess of 1 billion boe.

In late March, Exxon reported a new find near Liza in the southern portion of the Stabroek block, encountering more than 82ft (25m) of high-quality, oil-bearing sandstone reservoirs. 

Read more of our Liza coverage here.

Current News

Borr Drilling Reports Revenue Drop but Improved Outlook

Borr Drilling Reports Revenue

Trinidad Hopeful for Offshore Gas Projects with Venezuela

Trinidad Hopeful for Offshore

Viridien Teams Up with NVIDIA to Accelerate Seismic Imaging Workflows

Viridien Teams Up with NVIDIA

Dolphin Drilling, Vantris Ink Marketing Deal for Blackford Dolphin Semi-Sub

Dolphin Drilling, Vantris Ink

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine