Pacific Drilling rescinds Zonda contract

Published

Pacific Drilling announced that it has exercised its right to rescind the construction contract for ultra-deepwater drillship Pacific Zonda due to the failure by Samsung Heavy Industries (SHI) to timely deliver a vessel that substantially meets the criteria required for completion of the vessel in accordance with the construction contract and its specifications. Pacific Drilling made advance payments totaling approximately $181.1 million under the contract, and will be seeking a refund of the installment payments.

The Pacific Zonda was to be an upgraded dual load path Samsung 12000 design dynamically-positioned, dual gradient-capable drillship meant for moderate environments and water depths up to 3657m (12,000ft) using 18¾-in BOP and 21in OD marine drilling riser.

The drillship was originally meant to be delivered in Q2 2015.

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine