Allseas bags Valhall removal work

Image of Olav Henriksen (SVP Projects, Aker BP, left) and Pieter Heerema (Projects, Allseas) at the signing ceremony in Stavanger 29 May 2017. Image from Aker BP.

Allseas, via Excalibur Marine Contractors, has been awarded a long term frame agreement for transport, installation and removal (T,I&R) services for Aker BP, for removal of the Valhall QP topsides and QP/DP bridge in 2019 and disposal thereafter. 

The deal is for six years, with options to extend the contract twice for two years each.

In addition, options have been agreed for removal and disposal of the QP and 2/4G jackets in the future.

Last month Heerema was awarded a long term T&I frame agreement and call off for Valhall Flank West (VFW) installation. The frame agreement will now be amended to include removal services and become a T,I&R frame agreement.

Current News

US Plans 12 Offshore Wind Auctions Over Five Years

US Plans 12 Offshore Wind Auct

Equinor Wraps Up Hammerfest LNG Leak Repair, Maintains Friday Restart

Equinor Wraps Up Hammerfest LN

Namibia Targets First Oil Production from Venus Field in 2029/2030

Namibia Targets First Oil Prod

Second HVDC Platform Installed at World’s Largest Offshore Wind Farm

Second HVDC Platform Installed

Subscribe for OE Digital E‑News

Offshore Engineer Magazine