Stone ahead on Cardona

Published

Laffayete, Louisiana-based Stone Energy is ahead of schedule on the deepwater Cardona development project in the US Gulf of Mexico.

The Cardona South well (MC 29 #4), located in Mississippi Canyon 29, is expected to begin initial production by 1 December 2014, six months after drilling. Stone believes gross production will reach an estimated 12,000 boe/d for both the MC 29 #5 and MC 29 #4 wells.

In February, Stone hit oil at the MC 29 #4 well using the ENSCO 8502 drilling rig, the same rig that is drilling MC 29 #5.

Stone Energy is the operator and has 65% interest of both Cardona wells.

Stone also announced that they acquired 40% working interest in the Noble Energy-operated Madison prospect located in Mississippi Canyon Block 479. The project is set to drill in 4Q 2014.

Image from Stone Energy

Read more:

Stone hits Cardona oil

Current News

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Inpex Secures Environmental Approval for Indonesia’s Abadi LNG Project

Inpex Secures Environmental Ap

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine