McDermott awarded Megalodon installation

Houston-based McDermott International won a contract to provide transportation and installation services to Walter Oil & Gas Corp. for the Megalodon platform in South Timbalier Block 311 in the Gulf of Mexico.

McDermott will provide all materials and equipment to transport and install the six-pile platform in 391ft of water, over an existing well site. The heavy-lift Derrick Barge 50 will perform a side-lift of the 3300ton jacket and set the 2100ton topsides. McDermott’s DB50 is dynamically positioned, premier heavy-left, deepwater lowering and pipelay vessel.

Installation is expected to commence in 4Q 2014.

McDermott recently completed the Ayatsil-B, one of Pemex’s four drilling platforms for use in the Mexican national’s Ayatsil-Tekel heavy oil field.

Read more:

Ayatsil-B platform complete

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine