Statoil to use Songa Equinox at Troll

Norway’s Petroleum Safety Authority (PSA) has given Statoil consent to use the Songa Equinox mobile drilling facility to drill well 31/2-S-24 AY1H on the Troll field.

Songa Equinox. Image from Songa Offshore.

Troll is around 65km west of Kollsnes in Hordaland County and is the largest gas discovery made in the North Sea.

The consent is an extended consent to use the controlled mud level method – formerly referred to as dual gradient drilling (DGD). 

The expected start-up is late September 2017. The activity is expected to last 75 days.

Songa Equinox is a semisubmersible drilling facility operated by Songa Offshore. The rig received an Acknowledgement of Compliance (AoC) on 20 November 2015.

Current News

US Plans 12 Offshore Wind Auctions Over Five Years

US Plans 12 Offshore Wind Auct

Equinor Wraps Up Hammerfest LNG Leak Repair, Maintains Friday Restart

Equinor Wraps Up Hammerfest LN

Namibia Targets First Oil Production from Venus Field in 2029/2030

Namibia Targets First Oil Prod

Second HVDC Platform Installed at World’s Largest Offshore Wind Farm

Second HVDC Platform Installed

Subscribe for OE Digital E‑News

Offshore Engineer Magazine