Shell to drill at Draugen with Island Constructor

Published

Norway’s Petroleum Safety Authority (PSA) has given Norske Shell consent to use the Island Constructor mobile drilling facility for start-up and repair of wells on the Draugen field, offshore Norway.

Draugen is an oil field in the Norwegian Sea in 250m of water. The field has been developed using a fixed concrete facility with an integrated deck. Stabilized oil is stored in tanks in the base of the facility.

Island Constructor is a facility designed for well intervention which is operated by Island Offshore Management. The facility received Acknowledgement of Compliance (AoC) in September 2010.

In April, Island Offshore secured contracts with Norske Shell worth US$12 million (100 million NOK) for two of its vessels, the Island Valiant and Island Constructor at the Draugen oil field.

The Island Valiant will began its contract with IMR-work (inspection, maintenance and repair) on three wells in April, preparing the wells for the work, which the Island Constructor will perform later in the summer.

Image of the Island Constructor, from Island Offshore.

Read more:

Two Island vessels ink Shell work

Current News

Ndungu Full-Field Starts Up Offshore Angola

Ndungu Full-Field Starts Up Of

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

Norway's 2025 Oil Output Climb

AKOFS Offshore Inks New Vessel Deal with Petrobras

AKOFS Offshore Inks New Vessel

UK Trade Body Challenges Government View on North Sea Gas Decline

UK Trade Body Challenges Gover

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine