Van Oord wins Shell Gabon EPC contract

Shell Gabon awarded Van Oord an engineering, procurement and construction (EPC) contract for the replacement of a dual 10km long oil export line.

The EPC contract began this month and continues until summer 2015.

The export line runs from the Gamba terminal, 200 NM south of Port of Gentil, to a pipeline end manifold (PLEM). The existing 30 in. line will be replaced by a looped dual 22 in. sea line system with pigging facilities allowing for inspection and cleaning. Van Oord will deploy shallow water pipe lay barge Stingray.

Last month, Shell made a large exploration discovery at the Leopard-1 well, offshore Gabon. The exploration well encountered a substantial gas column with around 200m net gas pay in a pre-salt reservoir.

In September, Ulstein won the design and equipment contract for Van Oord’s new subsea rock installation (SRI) vessel Bravenes.

Read more:

Shell in Gabon discovery

Ulstein to design Van Oord SRI vessel

Current News

ABL Gets Neptun Deep Job for OMV Petrom in Black Sea

ABL Gets Neptun Deep Job for O

Petrobras and China’s CNCEC to Collaborate on Oil and Gas, Renewables

Petrobras and China’s CNCEC to

Norway Clears TGS and PGS Merger

Norway Clears TGS and PGS Merg

Full Capacity Operations at Tyra II Gas Development Up for Potential Delays

Full Capacity Operations at Ty

Subscribe for OE Digital E‑News

Offshore Engineer Magazine