Fugro supports Quad 204 construction

Real-time metocean data transmitted by a Fugro SEAWATCH Wavescan buoy is supporting Technip's construction program on BP's Quad 204 project West of Shetland.

The work is Technip’s largest UK North Sea contract to date and involves replacing the existing Schiehallion production facility with a new, purpose-built FPSO (floating, production, storage and offloading facility) and installing extensive new subsea infrastructure.

Commercial Manager, Jonathan Ainley says: “West of Shetland is well known as a harsh offshore environment with big waves and strong currents – conditions that are far from ideal in a construction setting. 

“We have worked with both Technip and BP for many years and know that maintaining a safe operating environment is the number one priority. BP specifically required reliable real-time wave height, wind and current data to manage their installation criteria thresholds. Access to these metocean data is also critical for vessel management and safe and efficient operational planning.”

The SEAWATCH Wavescan buoy was manufactured by Fugro in Norway. At 2.8m-diameter, with a counterweighted keel to prevent capsize, it is large enough to cope with the harsh North Sea conditions. A 3.5m mast supports the buoy’s meteorological sensors and antennae, while a range of subsea sensors monitor oceanographic conditions.

In March, using the Fugro Symphony vessel, the Wavescan buoy was deployed in its designated position. During its nine-month deployment its sensors will collect oceanographic and meteorological data for a comprehensive range of parameters including, air pressure, air temperature, current velocity/direction and water temperature. Current profilers will be used in two locations (one just below the buoy and another further down the mooring) to build a current profile for the full water column depth. Wave data parameters to be measured include heave, surge, sway, direction, height and wave period.

The buoy transmits the data by satellite to Fugro, where it is presented in real-time on a website that uses a variety of user-friendly pages and options, including a graphic format (to display current velocity/direction information for the full water column depth) and tabular data.

In the event that the deployment period is extended, Fugro will service the buoy to ensure continued operation during the winter period.

 

Current News

New York Not Moving Forward With Three Offshore Wind Farms

New York Not Moving Forward Wi

DNV Awards Certificates for Fortescue’s Dual-fueled Ammonia-powered Vessel

DNV Awards Certificates for Fo

Energy Storage on O&G Platforms - A Safety Boost, too?

Energy Storage on O&G Platform

Türkiye Aims to Drill for Oil Off Somali Coast Next Year

Türkiye Aims to Drill for Oil

Subscribe for OE Digital E‑News

Offshore Engineer Magazine