BW Offshore gets Polvo extension

BW Offshore signed an agreement with Petrorio for a one-year extension for the lease and operation of the FPSO Polvo.

The firm period has been extended to 3Q 2016 (from 3Q 2015), with options until 3Q 2022. 

BW Offshore is operating the FPSO offshore Brazil.

Image of the Polvo FPSO. From BW Offshore.

Current News

First Oil from Shell's Bonga North Tranche 1 in 2027/2028

First Oil from Shell's Bonga N

Petrobras to Begin Drilling at Colombia's Uchuva-2 Well This Month

Petrobras to Begin Drilling at

Petrobras Required to Assess Indigenous Impact of Amazon Offshore Drilling

Petrobras Required to Assess I

Japan’s First Offshore Solar Demonstrator Hits Water in Tokyo

Japan’s First Offshore Solar D

Subscribe for OE Digital E‑News

Offshore Engineer Magazine