MacGregor assigns new VP

Published

MacGregor has reorganized into seven operative divisions since the beginning of 2015. The offshore mooring and loading division drives the development of systems and equipment for offshore floating units. MacGregor has appointed Høye G. Høyesen as VP, offshore mooring and loading division, effective 1 April 2015.

Høyesen joins MacGregor from APL Norway/NOV, where he has held the position of VP, business development. Before that he has worked in several key positions at APL Norway/NOV during the past 18 years. "Høyesen brings his long and valuable industry experience with a proven track-record in successfully leading similar operations," says Mika Vehviläinen, interim president of MacGregor.

Høyesen succeeds Leif Haukom, who has led the mooring and loading division until his retirement.

Image of Hoyesen. From MacGregor. 

Current News

AF Offshore Secures North Sea Decom Job

AF Offshore Secures North Sea

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Island Offshore’s Hybrid OECV

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Jumbo Offshore Wraps Up Errea

Petronas Takes Operatorship of Oman’s Offshore Block 18

Petronas Takes Operatorship of

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine