Ennsub completes Wheatstone work

Ennsub completed the design, manufacture, testing and installation of bespoke sealing systems for the Wheatstone liquefied natural gas (LNG) platform off Australia.

The company designed two different systems to provide an external and internal sealing system for 64-off 8 in. NS ballasting pipes located at each corner of the platform.

Ennsub was responsible for the design and supply of all equipment, including downline recovery winches, remote disconnect heads and isolation plugs. Following an intensive factory-acceptance test program, which simulated the offshore conditions, four Ennsub engineers were mobilized to Australia to perform the installation of the 128-off bespoke sealing systems.

The solution presented by Ennsub replaced the alternative grouting solution which was being considered by the end user and the success of the operation exceeded all parties’ planned timescales with Ennsub’s engineers successfully completing the installation in half the time allocated.

Image from Ennsub.

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine