ABB wins Wuchang Shipbuilding contract

Published

A new offshore construction vessel, to be built by Wuchang Shipbuilding Industry Group Co. will be the first to include ABB’s integrated power and automation solution, which consists of the company’s power, propulsion, and 800xA control and safety system.

These systems will be integrated and run on a single-control system platform for the 5000-ton heavy-lift pipelay construction vessel.

Electric propulsion and electrical and automation systems will be integrated and controlled by ABB’s 800xA distributed control system platform. Additionally, ABB’s advanced power system can run with closed bus in DP3 operations.

The vessel will be delivered in Q1 2018, and is designed for pipelaying, heavy lifting and subsea construction operations.

Current News

TVO Adds to Project Management Team

TVO Adds to Project Management

BOEM Proposes BBG3, Third Gulf of America Lease Sale

BOEM Proposes BBG3, Third Gulf

Op/Ed: Crude Oil's Iran Premium Assumes No Supply Disruption

Op/Ed: Crude Oil's Iran Premiu

Turkey Objects to Greece’s Chevron Energy Deal in Eastern Mediterranean

Turkey Objects to Greece’s Che

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine