LQT delivers GOM platform facilities

LQT Industries engineered and built a new series of aluminum accommodation modules that will be utilized by a major oil and gas operator on a platform in the Gulf of Mexico.

The buildings are 10ft x 35ft and weigh 16,000lb. The built modules, along with one of LQT’s modular helidecks, which will be placed on top of the accomodation modules, have been allocated for a major oil and gas operator and commissioned on a platform in the Gulf of Mexico in September 2014.

The fleet expansion adds another option to their wide variety of buildings to give customers more flexibility to choose the optimum accommodation package for their project. LQT’s construction division in Abbeville is currently in the process of building additional accommodation buildings to fulfill the increased demand for LQT’s products and services.

Current News

One-on-One: Rob Langford, VP, Global Offshore Wind, ABS

One-on-One: Rob Langford, VP,

Argeo Lands Woodside Energy’s Calypso Survey

Argeo Lands Woodside Energy’s

Equinor's Hammerfest LNG Plant Evacuated Due to Gas Leak

Equinor's Hammerfest LNG Plant

Mocean Energy’s Blue X Wave Device and Verlume’s Halo Battery Come Ashore

Mocean Energy’s Blue X Wave De

Subscribe for OE Digital E‑News

Offshore Engineer Magazine