Trelleborg secures Shah Deniz contract

Published

Trelleborg’s offshore operation has been awarded a substantial order for its foam buoyancy systems, for the Shah Deniz field phase 2 development offshore Azerbaijan.

Contracted by oil and gas company, BP, Trelleborg will supply a buoyancy package; filled with its high temperature syntactic foam.

Lee Roskell, Proposals Manager within Trelleborg Offshore and Construction, said: “There is a growing requirement in deepwater applications for flowlines to perform under high temperature and high pressure conditions. Large cyclic changes can cause expansion of the flowline, resulting in lateral or upheaval buckling. And at a depth of 600m/1968ft below surface, these flowlines will come under significant force.

“However, Trelleborg buoyancy modules will assist in mitigating this. By reducing the self-weight of the flowline and friction against the seabed, a span of lower resistance is established along the flowline, enabling the buckling to occur in known and controlled conditions.”

With a design life of 30 years, DBMs are typically used between a subsea structure and a surface vessel or platform. A specialist clamping solution securely attaches the DBM assembly to the desired location on a riser, allowing the DBMs to be fitted at any point along the length of the pipeline. The buoyancy segments are assembled to mechanically lock around the clamp and are secured with circumferential straps. 

 

Current News

TVO Adds to Project Management Team

TVO Adds to Project Management

BOEM Proposes BBG3, Third Gulf of America Lease Sale

BOEM Proposes BBG3, Third Gulf

Op/Ed: Crude Oil's Iran Premium Assumes No Supply Disruption

Op/Ed: Crude Oil's Iran Premiu

Turkey Objects to Greece’s Chevron Energy Deal in Eastern Mediterranean

Turkey Objects to Greece’s Che

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine