Aker BP orders from Plexus

Aker BP has made its first order with Plexus Holdings, specifically, for the supply of surface exploration wellhead equipment for the Hyrokkin and Nordfjellet standard pressure exploration wells, offshore Norway.  

The initial value of the contract is about £0.7 million, with potential for the contract to be extended to include additional wells in the future. 

Plexus has developed a new connector called POS-SPEED to help deliver time savings for the operator. The initiative builds on time savings and cost efficiencies delivered by the company's 18-3/4in POS-GRIP through BOP surface wellhead. Each of the wells are expected to take around 30 days to drill.  

Current News

AquaTerra to Provide Asset Integrity Services for BP and Ithaca Energy in North Sea

AquaTerra to Provide Asset Int

MENCK to Supply Pile-Driving Tool for UK Offshore Wind Farm Installation

MENCK to Supply Pile-Driving T

Chevron and ExxonMobil Portfolios Overlap Put Mega-Merger Back in Spotlight

Chevron and ExxonMobil Portfol

Carnarvon Wraps Major Seismic Project off Australia Ahead of 2026 Drilling Ops

Carnarvon Wraps Major Seismic

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine