PFLNG Satu loads first cargo

Published

Petronas’ first floating liquefied natural gas (LNG) facility, PFLNG Satu, has successfully loaded its first cargo at the Kanowit gas field, offshore Sarawak.

The first cargo was fully loaded onto the LNG carrier Seri Camellia which is expected to set sail for a South Asian market.

“This accomplishment effectively demonstrates Petronas’ proven technology and capability of adapting a conventionally land-based installation to a floating LNG facility, a game-changer in today’s LNG business landscape,” says Petronas President and Group CEO Datuk Wan Zulkiflee Wan Ariffin.

Manned by 145 crew onboard, PFLNG Satu is designed for water depths of between 70-200m and possesses a processing capacity of 1.2 MTPA. The facility achieved first gas last November and produced its first drop of LNG a month after. 

Image: PFLNG Satu / Petronas

Current News

Trump Calls Out California, UK Energy Deal

Trump Calls Out California, UK

DOF Group ASA Awarded Contract in Argentina

DOF Group ASA Awarded Contract

Jifmar, Seavium Partner to Roll Out AI Across Offshore Fleet

Jifmar, Seavium Partner to Rol

DUG Hooks Multi-Client Seismic Reprocessing Survey off Malaysia

DUG Hooks Multi-Client Seismic

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine