CX-15 tower installation

OE Staff
Tuesday, March 5, 2013

Offshore engineering firm GMC Ltd. provides this video of the 2,500-ton CX-15 buoyant tower, touted at the world's largest, being installed at Corvina Field off Peru for BPZ Energy. The tower hull measures 69.9m with four, ring-stiffened connected cylindrical tubes including one central suction pile. Installed in October, the CX-15 supports a 1,500-ton, three-level topsides facility – designed by Audubon Engineering and GMC – and has a production capacity of 12,200 b/d and 12.8 MMcf/d of gas. BPZ Energy said it expects to drill its first well on the development within three to six weeks time.

Categories: Drilling Production South America System Design Installation

Related Stories

Seadrill to Sell its Qatar Jack-up Fleet

Black & Veatch Completes Feasibility Study for Colombia’s New LNG Terminal

Liza Unity FPSO Hits Peak Output

Current News

Women in Maritime Day: Shaping the Future of Maritime Safety

New Dutch Coalition Aims for More Offshore Gas Extraction

Iberdrola to Triple Offshore Wind Assets

ABS Wavesight eLog Books for Offshore Drilling

Subscribe for OE Digital E‑News