Wood Group gets Echidna work

OE Staff
Friday, April 7, 2017

Wood Group was awarded a multi-year contract from Karoon Petróleo & Gás to provide owner’s engineering services to support the full field development for the Echidna field offshore Brazil marking the first project between the two companies. The contract will be executed by Wood Group’s Rio de Janeiro office focusing on the technical requirements of a floating production unit (FPU) and subsea structures, and all bid package evaluations and execution phase. The equipped FPU will be located in the Echidna field within the Santos Basin and moored in a maximum water depth of 400m.

“Our ability to deliver local world-class design capabilities with a range of available tools and software made Wood Group a partner of choice for the field development project,"saidHugues Corrignan, managing director of Wood Group Brazil’s office. “Wood Group’s competitive bid, provided an excellent opportunity for both companies to establish a mutually rewarding partnership for current and future developments.”

Read more:

Premier awards topside O&M contract to Wood Group

Wood Group wins Mad Dog 2 work

Karoon hits at third Santos well

Karoon confirms Echidna oil

Categories: Contracts Vessels Engineering Subsea South America Floating Production Design

Related Stories

James Fisher Wraps Up Decommissioning Work Offshore Thailand

VARD to Build Hybrid Ocean Energy Construction Vessel for Island Offshore

Odfjell Technology Boosts Asia Pacific Presence with New Contracts in Malaysia

Current News

New Petrobras CEO Pressed on Shipbuilding Reboot, Jobs

Seadrill to Sell its Qatar Jack-up Fleet

Anchoring Ops for FPSO Atlanta Start Offshore Brazil

Wind Power LAB Releases LASSIE to Fend Off Lightning Damage at Wind Farms

Subscribe for OE Digital E‑News