PSVM production starts

OE Staff
Wednesday, April 10, 2013

BP began production from the PSVM development in block 31, off Angola. Three wells at the Plutao field are expected to increase production at PSVM to about 70,000b/d of oil. Output will increase to 150,000b/d once Saturno, Venus, and Marte fields come online later this year and next. Forty production, gas, and water injection wells will be connected to the FPSO through 15 subsea manifolds and associated subsea equipment.

Categories: FPSO

Related Stories

Brava Energia Brings FPSO Atlanta Up to Speed with Six Connected Wells

Brava Energia Brings FPSO Atlanta Up to Speed with Six Connected Wells

Solstad’s Normand Pioneer CSV Up for Petrobras Job

Solstad’s Normand Pioneer CSV Up for Petrobras Job

MODEC, Eld Energy Advance FPSO Offshore Fuel Cell Pilot

MODEC, Eld Energy Advance FPSO Offshore Fuel Cell Pilot

Current News

SLB Gets CCS Job in North Sea for BP, Equinor and TotalEnergies JV

CEP Makes ‘Significant’ Oil Discovery Offshore Poland

Pandion Energy Divests Interests in Three Norwegian Assets to Inpex

Serica Energy Strengthens North Sea Portfolio with Latest Acquisition

Subscribe for OE Digital E‑News

Offshore Engineer Magazine